|
Step 1
Delivered to site ready for pointing (on the ground).
|
Step 2
Crane into position on the trusses using the lifting eyes and loops supplied.
|
Step 3
Drill through support plates and screw to trusses using the fixings provided.
|
Step 4
Batten over the support plate as shown and tile the roof.
|
|
Step 5
Apply the supplied sealant to the channel before and after flashing.
|
Step 6
The lead is then dressed securely into the flashing channel.
|
Step 7
Job done! The finished chimney is in place.
|
|